Información En Español
PROP X - South Bay Union School District
PROP X About PROP X Proposed Scope of Work About South Bay Union School District In The News Program Documents Contact Us

Proposed Scopes of Work

The following scopes of work are approved and supported by the bond measure. Scopes are subject to change as design and planning process progresses.

Bayside Elementary- Built in 1956 Nicoloff Elementary- Built in 1978
Berry Elementary- Built in 1971 Oneonta Elementary- Built in 1959
Central Elementary- Built in 1952 Pence Elementary- Built in 1975
Emory Elementary- Built in 1931 Sunnyslope Elementary- Built in 1966
Imperial Beach Charter- Built in 1943 VIP Village Preschool- Built in 1991
Mendoza Elementary- Built in 1999 West View Early Learning Center- Built in 1949
Nestor Language Academy Charter- Built in 1961  

Bayside Elementary- Built in 1956

  • Make health and safety improvements, including removing asbestos and other hazardous materials and installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and sewer systems
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Upgrade old playgrounds, playfields, and equipment
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Replace old portable classrooms with new classrooms
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers

BACK TO THE TOP

Berry Elementary- Built in 1971

  • Make health and safety improvements, including removing asbestos and other hazardous materials and installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and sewer systems
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Upgrade old playgrounds, playfields, and equipment

BACK TO THE TOP

Central Elementary- Built in 1952

  • Make health and safety improvements, including removing asbestos and other hazardous materials
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and sewer systems
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Upgrade old playgrounds, playfields, and equipment
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Replace old portable classroom with new classroom
  • Repair/replace deteriorating roofs

BACK TO THE TOP

Emory Elementary- Built in 1931

  • Make health and safety improvements, including removing asbestos and other hazardous materials
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and sewer systems
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Upgrade old playgrounds, playfields, and equipment
  • Repair/replace deteriorating roofs

BACK TO THE TOP

Imperial Beach Charter- Built in 1943

  • Make health and safety improvements, including removing asbestos and other hazardous materials
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and sewer systems
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Replace deteriorating storm drains
  • Upgrade old playgrounds, playfields, and equipment
  • Replace old portable classrooms with new classrooms

BACK TO THE TOP

Mendoza Elementary- Built in 1999

  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Renovate and repair restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Upgrade old playgrounds, playfields, and equipment

BACK TO THE TOP

Nestor Language Academy Charter- Built in 1961

  • Make health and safety improvements, including removing asbestos and other hazardous materials and installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and sewer systems, including water lines/stop valves
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Upgrade old playgrounds, playfields, and equipment
  • Repair/replace deteriorating roofs
  • Replace old portable classrooms with new classrooms

BACK TO THE TOP

Nicoloff Elementary- Built in 1978

  • Make health and safety improvements, including removing asbestos and other hazardous materials and installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing including storm drains
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Upgrade old playgrounds, playfields, and equipment
  • Replace old portable classrooms with new classrooms

BACK TO THE TOP

Oneonta Elementary- Built in 1959

  • Make health and safety improvements, including removing asbestos and other hazardous materials and installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing including and sewer systems, including storm drains and water lines/stop valves
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Upgrade old playgrounds, playfields, and equipment
  • Repair/replace deteriorating roofs

BACK TO THE TOP

Pence Elementary- Built in 1975

  • Make health and safety improvements, including removing asbestos and other hazardous materials and installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and storm drains
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Replace deteriorating eater lines/stop valves
  • Upgrade old playgrounds, playfields, and equipment

BACK TO THE TOP

Sunnyslope Elementary- Built in 1966

  • Make health and safety improvements, including removing asbestos and other hazardous materials and installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing and sewer systems
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Replace deteriorating sewer storm drains
  • Upgrade old playgrounds, playfields, and equipment
  • Replace old portable classrooms with new classrooms
  • Replace old portable classrooms with new classrooms

BACK TO THE TOP

VIP Village Preschool- Built in 1991

  • Make health and safety improvements, including installing PS systems/clocks
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Renovate and modernize outdated classrooms, restrooms, and school facilities
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Repair/replace deteriorating roofs
  • Replace old portable classrooms with new classrooms

BACK TO THE TOP

West View Early Learning Center- Built in 1949

  • Make health and safety improvements, including removing asbestos and other hazardous materials
  • Upgrade electrical systems and improve student access to computers and modern technology
  • Upgrade outdated fire alarm systems
  • Make handicap accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds
  • Repair/replace old and deteriorating plumbing including and sewer systems
  • Renovate and repair outdated restrooms
  • Make repairs and improvements to classrooms and school facilities, including the auditorium
  • Upgrade outdated heating, ventilation, and air-conditioning systems to improve energy efficiency.
  • Replace old windows with new windows
  • Make upgrades to the kitchen facilities
  • Improve student safety by installing additional fencing, security, and monitoring systems
  • Make general site improvements, including replacing deteriorating  concrete sidewalks/steps
  • Replace old and deteriorating storage containers
  • Upgrade old playgrounds, playfields, and equipment
  • Repair/replace deteriorating roofs

BACK TO THE TOP

Home | About Prop X & Y | Proposed Scopes of Work | About South Bay Union School District | In The News | Program Documents | Contact Us Copyright © 2013. All Rights Reserved.